October 2016
Project: Framo Multiphase Pump Changeout
Location: Western Australia
Client: Woodside Energy Ltd.
Field: Vincent, located NW of Exmouth, WA
Vessel: Nor Australis
Water depth: 363msw
Summary: Installation and operation of large A-Frame and articulating guide wire system onto the Nor Australis for recovery of Framo Multiphase Pumps. The system was rated for recovery up to 2.5m Hs which given the size and weight of the pumps was innovative. Recovery using the guide wire systems worked extremely well with zero downtime experienced on the project.
ID: 0084